Each opt-in creates this job's slice row on that division's Production board.
Nicholson's MW share of the combo contract. Leave blank if MW portion equals the full contract above.
Bid Link — Optional
If this job was in the bid log, enter the bid number to link them. Leave blank if the bid was too far back or never logged — the job will still be created.
Check this only for a real job that never had a bid (never logged / pre-2026). It clears any bid number, and lets this job get a project folder as manual origin. If you find the real bid later, uncheck this and link it normally.
⚠ This job cannot be set up from this link
Job Identity
IQ operational # — the Sage-independent number (IQ-<bid>-<div>00), assigned at award. It does not go in the Sage Job # field above.