Nicholson's DW share of the combo contract. Leave blank if it equals the full contract below.
Saves to Drywall only (Drywall Production). The PM field below is this job's home-division PM.
Saves to the bid log's Drywall estimator. The Estimator field below is this job's home-division estimator.
Nicholson's CV share of the combo contract. Leave blank if it equals the full contract below.
Saves to Civil only (Civil Production). The PM field below is this job's home-division PM.
Saves to the bid log's Civil estimator. The Estimator field below is this job's home-division estimator.
Each opt-in creates this job's slice row on that division's Production board.
Nicholson's MW share of the combo contract. Leave blank if MW portion equals the full contract above.
Saves to Millwork only (Millwork Production). The PM field above is this job's home-division PM.
Saves to the bid log's Millwork estimator. The Estimator field above is this job's home-division estimator.
Bid Link — Optional
If this job was in the bid log, enter the bid number to link them. Leave blank if the bid was too far back or never logged — the job will still be created.
Check this only for a real job that never had a bid (never logged / pre-2026). It clears any bid number, and lets this job get a project folder as manual origin. If you find the real bid later, uncheck this and link it normally.
⚠ This job cannot be set up from this link
Job Identity
IQ operational # — the Sage-independent number (IQ-<bid>-<div>00), assigned at award. It does not go in the Sage Job # field above.
Contract & Dates
Team & Status
Job Status
Setup
Active
Punch
Closeout
On Hold
Jobs Entered This Session
Job Roster — Database
Millwork
Drywall
Civil
◷ JSR Intake
Filter:
Job #Project NameGCPM$ PM DT SGE BID JSRActions
Active JSR Jobs Missing Bid Linksloading...
BROWSE BIDS
—
YEAR:
EDIT JOB
—
Division — · use the roster's Assign # pill to set the Sage Job #.
Secondary module slices
Each opt-in creates/keeps this job's slice row on that division's Production board.